This document covers the complete installation and upgrade procedures for the HSR95 cabinet and rackmount HSC95 controller. It includes site preparation and planning, instructions for cabinet installation, applying power to the controller, performing inline device integrity tests, setting system parameters, and procedures for installing additional components like HSC95 controllers and StorageWorks (SBB) shelves. The manual also provides detailed information on rackmounting the controller and changing its requestor configurations.
Site structure and layout ©2026 Majenko Technologies