This guide provides instructions for the installation, maintenance, and configuration of the 2T-ISPxx Rack-Mountable Hierarchical Storage Controller (HSC) Integrated Storage System (ISP) and the DECraid+ Storage System. It covers site preparation, unpacking, installation of enclosures, cabling (CI and SDI/STI cables), power connections, and system startup. Detailed appendices include system options, tie-down installation for raised floors, and maintenance procedures such as replacing field-replaceable units (FRUs), requester module usage rules, and cable routing guidelines. The document is intended for Digital-qualified service personnel.
Site structure and layout ©2026 Majenko Technologies