Sx300 Storage Array

Installation Guide

Order Number: EK-SX300-IG.B01

This document provides step-by-step instructions for installing various storage components (Sx7x and RA9x storage enclosures, and magazine tape subsystems) into the Sx300 storage array cabinet. It covers site preparation, unpacking, physical installation, cabling for both single-host and dual-host configurations, power-up procedures, final verification, and troubleshooting steps. It also includes specific appendices for configuring DSSI storage arrays with VAX 4000 systems and performing hardware upgrades.

EK-SX300-IG.B01-B01
December 1994
320 pages
Quality

Original
1.7MB

Site structure and layout ©2026 Majenko Technologies