VAXft 3000 Site Preparation and Installation Guide

Addendum

Order Number: EK-VXFT1-AD

This addendum serves as a supplement to the main VAXft 3000 Site Preparation and Installation Guide (EK-VXFT1-IN). It offers essential guidance for OEM customers regarding the rack mounting of VAXft 3000 system components, specifically the BA22-style equipment boxes. Key areas covered include:

  • Design Considerations: Guidelines for unit weight, dimensions, and center of gravity to ensure stability.
  • Rack Construction: Requirements for supporting the weight, including the necessity of using both front and rear rail systems with custom support brackets.
  • Heat and Airflow Management: BTU calculations, airflow requirements, and cooling recommendations.
  • Cable and Power Management: Guidelines for front-side cable routing and power distribution to avoid single points of failure.
  • Grounding: Procedures for ensuring proper electrical grounding between units in a rack.
EK-VXFT1-AD-001
May 1990
19 pages
Quality

Original
0.2MB
EK-VXFT1-AD
December 1990
19 pages
Quality

Original
0.3MB

Site structure and layout ©2026 Majenko Technologies