This document serves as a comprehensive guide for the site preparation and physical installation of VAXft fault-tolerant systems. It covers:
- Site Preparation: Requirements for floor space, environmental conditions (temperature, humidity, air quality), and power distribution for different models.
- Installation Procedures: Detailed steps for unpacking, inspecting, and installing cabinets for the VAXft 110, 310, 410, 610, and 612 models, including cabling and power-on testing.
- Appendixes: Information on module handling, configuration of the DEC WANcontroller 620, system drive replacement, and specific rackmount installation instructions for OEM customers.