Installing an HSZ80 Array Controller

Order Number: EK-Z8CTL-IN

This document provides step-by-step procedures for the replacement and installation of an HSZ80 array controller. It covers two primary configuration scenarios:

  • Dual-Redundant Controller Configuration: Detailed steps are provided for both removing a controller (using the FRUTIL utility to quiesce device ports and safely transition the system) and installing a new controller (incorporating configuration synchronization and purging of old configuration data).
  • Single Controller Configuration: Procedures for taking the host offline, shutting down the controller, and replacing the hardware, including post-installation tasks such as patching and logical unit re-mounting.

The guide emphasizes safety precautions, specifically regarding electrostatic discharge (ESD) protection and adherence to specific terminal commands to prevent data loss.

EK-Z8CTL-IN-A01
May 2000
3 pages
Quality

Original
90.5kB

Site structure and layout ©2026 Majenko Technologies