PrintServer 40

Field Change Order

Order Number: LPS40-R001

This Field Change Order (FCO) LPS40-R001 Rev B provides instructions to upgrade all field units of the PrintServer 40 to revision level B1 to resolve problems affecting paper jam rates and print quality degradation. This revision supersedes the original release from July 1988 and includes additional corrections for three-hole paper jamming, updated procedures, and new part numbers. The FCO applies to units with LN02, FDS, and LCIT revision levels below B1. The estimated installation time is 6.0 hours.

LPS40-R001
December 1988
3 pages
Quality

Original
4.9kB

Site structure and layout ©2026 Majenko Technologies