BA47X-AA Vertical Floor Stand

Installing Your System

Order Number: EK-SNDPR-IC.C01

This document provides instructions for installing the BA47X-AA vertical floor stand. It covers unpacking the kit, preparing the system unit, mounting the unit to the floor stand, and correctly positioning the assembly. It also includes guidance on connecting multiple floor stands together.

EK-SNDPR-IC.C01
December 1993
12 pages
Quality

Original
0.2MB

Site structure and layout ©2026 Majenko Technologies