KT8-A Field Installation and Acceptance Procedure

Order Number: KT8A-3

This document details the field installation and acceptance testing procedures for the KT8-A Memory Management option, designed for PDP-8 systems. It covers the necessary hardware components, including the M8416 Memory Management board and the M9020 terminator. The manual provides detailed instructions on:

  • Installation and hardware configuration requirements.
  • Memory address switch settings for various configurations.
  • Slot option definitions for different BA8-C box setups.
  • Acceptance testing procedures to verify successful installation.
  • Detailed logic diagrams and parts lists for the M8416 Memory Management board.
KT8A-3
2000
19 pages
Quality

Original
2.4MB

Site structure and layout ©2026 Majenko Technologies