Field Installation and Acceptance Procedure

MRB-F

Order Number: MRB-F

This engineering specification outlines the field installation and acceptance testing requirements for the MRB-F PROM board (order number MRB-F). It includes detailed instructions for physical installation into a PDP-8, 8M, 8E, or 8A system, requirements for shipping software, and procedures for running diagnostic tests to ensure proper system configuration. The documentation covers jumper and diode settings for various address configurations, providing both visual diagrams and lists of components required for assembly.

MRB-F
2000
7 pages
Quality

Original
0.7MB
MRB-F
2000
9 pages
Quality

Original
1.0MB
MRB-F
2000
5 pages
Quality

Original
0.5MB

Site structure and layout ©2026 Majenko Technologies