Field Installation and Acceptance Procedure for the DKC8-A

Field Installation and Acceptance Procedure

Order Number: EK-DKC8A-IN

This document provides the necessary steps to perform field installation and acceptance testing for the DKC8-A option on a PDP-8 system. It includes physical installation steps, hardware inspection, and a sequence of diagnostic tests using specific programs (DKC-AA Option Test 1-4) to verify correct system operation. The document also provides a component substitution chart and schematics for the DKC8-A board.

EK-DKC8A-IN
2000
5 pages
Quality

Original
0.6MB

Site structure and layout ©2026 Majenko Technologies