Field Installation and Acceptance Procedure

Option Board #2

KM8-A

Order Number: KM8-A

This document provides the necessary engineering specifications, installation, and acceptance procedures for the KM8-A option board. It includes:

  • Installation Instructions: A step-by-step guide on how to prepare, inspect, and install the board into the computer.
  • Acceptance Testing: Procedures to verify correct operation of the KM8-A using diagnostic software.
  • Technical Details: A complete parts list and schematic diagrams for the Option Board #2 (M8317).
  • ROM Configuration: Detailed information on programming ROMs for the bootstrap and auto-restart functions.
KM8-A
2000
14 pages
Quality

Original
1.8MB

Site structure and layout ©2026 Majenko Technologies