This Engineering Change Order (ECO) document outlines two specific technical modifications for the PDP-11 family:
The document mandates immediate retrofitting for units using M7821 modules and schedules retrofits at the next Preventive Maintenance (PM) interval for units using M7820 modules. The estimated time to install and test these changes is 0.5 hours.
Site structure and layout ©2026 Majenko Technologies