| Volume | 23 |
This document, a technical memorandum from Digital Equipment Corporation, outlines the planned schedule of systems software tasks for the PDP-X over a 22-month period. It includes a project chart detailing timelines for components such as the bootstrap assembler, various compilers, operating system components, math libraries, and utilities. The document notes that software will be upward compatible from Model I to Model II at the source level. Manpower allocation for these projects is indicated as subject to change based on programmer availability, task redefinition, and hardware availability.
Site structure and layout ©2026 Majenko Technologies