Replacing a Fibre Channel Arbitrated Loop Hub

A01

Order Number: EK-80HUB-IN

This document outlines the procedure to replace a Fibre Channel Arbitrated Loop Hub (DS-DHGGA-CA). It details the necessary steps, including safety precautions to turn off AC power before installation, placing the hub, connecting data cables, and the power-on and initialization sequence for the hub, subsystem, and server/host to ensure the system is ready for operation.

EK-80HUB-IN-A01
May 2000
1 pages
Quality

Original
6.6kB

Site structure and layout ©2026 Majenko Technologies