This document defines the standard procedure for field installation and acceptance testing of the DKC8-A. It covers equipment requirements, inspection, installation steps, and an acceptance procedure involving diagnostic tests to ensure the unit is operational before handover.
Site structure and layout ©2026 Majenko Technologies