This document outlines the procedures for replacing a cache module in an HSZ70 array controller. It covers two scenarios:
FRUTIL field-replacement utility to safely remove and install a cache module, including disabling failover and quiescing ports.FMU fault management utility to dismount storage, shut down the controller, and replace the cache module.Included are specific safety precautions for handling VHDCI cables, such as cleaning connectors and maintaining proper torque when tightening retaining screws.
Site structure and layout ©2026 Majenko Technologies